Engineering · 2017–2018 · Delivered
How do you show a driver something they can't see?
Wireless EV charging demonstrators
Wireless charging demonstrators that used the shape of a pedestal and its lighting to guide alignment and show charging progress.
- Role
- Design lead, team of three
- Years
- 2017–2018
- Project status
- Delivered
- Organisation
- Ford Motor Company
- Categories
- Engineering
- Sources
- I02, S15, S16
- Demonstrator requirements and design integration
- Delivered 2017–18
- Physical prototypes
- Full-size mock-ups Oct 2017; two brand variants built and lit, Jan–Feb 2018
- Public demonstration
- Shown (per CV; date and venue pending)
- Production feature
- Not a product
04Situation
Removing the charging cable creates a new problem: how does a driver line up with a pad under the car and know that charging has started? In 2017, I led the physical design of Ford's wireless-charging pedestal, lighting, and indicators. The power-transfer engineering was handled by other groups; my work was to make the interaction understandable. [I02][S15]
The constraints were already decided by the electronics: a boxed power supply with a cable and ventilation, and a square inductive pad with its own supply cable. Everything else was open. The board I put in front of the charging-systems leads in April 2017 set a direction I called Modern Americana — the vintage gas pump, a Lincoln interior and the GT pit lane as references, and the Tesla Supercharger as the thing to be measured against. [S16]
05Work
The pedestal had no screen, so its light had to do three jobs: guide the car onto the pad, show that it was aligned, and show the state of charge. The gradient came first, in April 2017, as a Photoshop file and a colour table. In November 2017 I wrote the animation states in Arduino with the FastLED library, reading the vehicle's displayed state of charge from the CAN bus: [S16]
- Drive-up — fade on; vertical bars fill as the car gets closer; a slow landing pulse over the dim top region.
- Aligned — change to green, double blink, then the bar drains top-down.
- Charging — state of charge shown on the gradient, driven by the live signal.
- Drive-away — on disconnect, fade down like a gas pump draining.
- Fault — a yellow "put in park" warning, blinking like a forklift.


By October 2017 the pedestal existed at full size: a soft-edged column with a flared base and a recess on the front face where the wall-box charger mounts. Three were built in grey primer at the model shop. Ten days later Ford Design rendered the same architecture with Ford and Lincoln wall boxes, the charging pad and the LED charge gradient. [S16]
The wall unit is where the driver's eye lands, and it went through the loop the hero shows. A first white shell sat on the grey tower by the start of November 2017. I marked it up rather than redrawing it: where the break line between shell and base should move, where the ventilation needed to go and whether its pattern could be back-lit, an access cover with the on/off, a cable exit, and lighting along the borders so the state reads from across a garage. From that came the form that stuck — a shell narrowing toward the floor, a dark lower body carrying the brand and the status light, two light pipes running the height of the unit — rendered in the two brands' languages: a white Ford unit with a hexagonal grille and an amber line, a dark Lincoln unit with a brick-pattern top and a blue line.










By June 2018 the pedestal, coil cover and inverter cover existed as printable solids; my print notes asked for high-detail resin parts, a port big enough to slide an Arduino inside, and embossed light channels on the inverter so the light pipe could be masked before paint. [S16]
06Decision
The demonstrator needed people to understand alignment, power flow, and completion as they walked around it. That shaped how much the lighting showed and how far away it could be read. We were designing an exhibit, so the indicators made the process more visible than a production unit might need.
07Status
The CV records two public demonstrators in 2017–18, built by a team of three in which I was design lead: the charging hardware and its indicators integrated into a vehicle and a floor pad that visitors could walk around. [I02] The record now runs from the April 2017 board to finished, lit units in two brand languages by February 2018; the show dates and venue are still to be confirmed, and no outcome for the programme is recorded. This was exploratory work, distinct from the Mach-E charging products that followed, and it did not ship as a feature. The interaction thinking — light as the whole interface, alignment before charge, a fade that reads like a gauge — carried into the Connected Charge Station two years later, whose status light and back-lit mark sit on the cover of the main box. [S16]
08A model for the desk
The same object at a tenth the scale: a 3D-printed tower and pad with a Qi coil in the pad, wired to a bench supply, that charges a phone set on it. It was made for the fun of it, and it turned out to be the most useful explainer we had — the whole system in two hands, with the invisible part doing something you could watch.


References & documentation
- 1. I02`01 CV - Gelfuso.pdf` and revised CVs, Oct 2026 — Dates, roles, projects, publication statements; reconcile conflicting older versionsfirst-party
No, owner-supplied CV
- 2. S15RPI Every Day Matters — Rensselaer Graduate Named to Ford's 30 Under 30 — Independent university coverage of Dominic's selection for the 2018 Ford Thirty Under 30 fellowship; linked the (now unavailable) application video
Covers selection, not the First Step project outcome; the video it linked was the Swersey tribute, not the team recap. Added 2026-10-23 from Dominic's archive search.
- 3. S16Personal archive — Ford charging work 2017–2020 (photo albums, sketch sheets, emails, Drive renders), catalogued in the Portfolio Source Pack sections 10–12 — Dated photographs and files for the wireless pedestal (Apr 2017–Jun 2018), the charge-coupler redesign (Apr 2019–Jun 2020), cordset and wallbox renders (2019) and the Mach-E launch year; records-dossier Addendum 5 lists dates and thread idsfirst-party